EPA Issues New MSGP!

June 4, 2015

 

On June 4, 2015, the USEPA issued the new Multi-Sector General Permit (MSGP) for Stormwater Discharges from Industrial Activities.  The new MSGP replaces the MSGP that was issued in September 2008.

iStock_000044983420_Mewdiusm.jpg

 

Deadline: September 2, 2015

Facilities authorized for coverage under the 2008 MSGP will need to update their Stormwater Pollution Prevention Plans (SWPPPs) and file a Notice of Intent (NOI) by September 2, 2015.

 

What's different for this permitting cycle?  

The requirements of the new MSGP are similar to the requirements of the 2008 MSGP; however, the USEPA has made some changes to the reporting requirements. Changes most likely to affect your facility include: 

  1. All reports must be submitted electronically via the Central Data Exchange (CDX) website via the NPDES eReporting Tool (NeT). 
  2. Annual reports must include a summary of the routine inspections and assessments conducted at the facility throughout the previous year. 
  3. The facility’s SWPPP must be posted online and/or addressed in the NOI. 

 

Download a 2015 MSGP Fact Sheet

Click to download as a PDF. 

2015_MSGP_Fact_Sheet.jpg

 

Need a hand? Have a question?

Please contact Suzanne Pisano, GeoInsight's Director of Compliance, at 978-679-1600,
e-mail her at slpisano@geoinc.com, or click to Ask an Expert